Creo Industrial Arts
partnered directly with the architect and general
contractor for interior and exterior signage at
this 10,000 seat arena. The design and materials
of the signage integrated elements of the contemporary
architecture of the building, while maintaining
the character of the historic core of downtown Everett.
Creo Industrial Arts staff guided
the entire project from preliminary concept through
final implemen-tation. The arena has been a huge
success since opening day in 2002, and has spearheaded
a city-wide redevelopment campaign. |